DOAS vs RTU: 5-Year Cost & Payback Estimator

A directional model of first-cost premium versus energy savings, built from the NEEA/BetterBricks DOAS economic analysis. It is a planning estimate, not a quotation.

Modeled annual energy savings
Estimated first-cost premium
Modeled payback (years)

5-year cumulative energy cost (relative)

RTU
DOAS
Get a project-specific TCO analysis →