Make-Up Water and Water-Cost Estimator

Evaporative-condenser water budget from the KAFZ consumption tables.

System Analysis and Water Management

Efficient cooling water management is critical for B2B industrial infrastructure and cost optimization. Evaporative-condenser heat loads demand consistent water replenishment to maintain stable cooling loops. Use our corporate estimation tool to calculate baseline requirements and map out annual operation budgets based on local water tariffs.

Calculation Methodology

Method: make-up water = ~0.79% of chilled-water flow (KAFZ evaporative condenser, evaporation only) × run-hours × load factor. Blowdown is additional and set by your make-up water chemistry — typically similar to the evaporation rate. Indicative estimate, not a quotation.

Request a full water-treatment and blowdown specification →
Make-up water (m³/year)
Annual water cost