Get in Touch with Koven Air Company
Make-Up Water and Water-Cost Estimator
Evaporative-condenser water budget from the KAFZ consumption tables.
System Analysis and Water Management
Efficient cooling water management is critical for B2B industrial infrastructure and cost optimization. Evaporative-condenser heat loads demand consistent water replenishment to maintain stable cooling loops. Use our corporate estimation tool to calculate baseline requirements and map out annual operation budgets based on local water tariffs.
Calculation Methodology
Method: make-up water = ~0.79% of chilled-water flow (KAFZ evaporative condenser, evaporation only) × run-hours × load factor. Blowdown is additional and set by your make-up water chemistry — typically similar to the evaporation rate. Indicative estimate, not a quotation.
—
Make-up water (m³/year)
—
Annual water cost