Get in Touch with Koven Air Company
Dry Cooling Coil Project-Fit & RFQ Estimator
Turn the main cleanroom or pharmaceutical design constraints into a preliminary engineering brief. The result identifies fit signals and missing checks; it does not issue a final model or performance guarantee.
Project conditions
Application
Design airflow (m³/h)
Entering air (°C)
Entering relative humidity (%)
Available water supply (°C)
Maximum face velocity (m/s)
Maximum air-side pressure drop (Pa)
Drain-pan preference



![Commercial Rooftop Unit Guide: Types, Sizing & Costs [2026]](https://kovenair.com/wp-content/uploads/2026/07/commercial-rooftop-unit-guide-featured-2-150x150.png)
