Data Center Chiller Energy Check

Data Center Chiller Energy Check

This estimator helps a data center team frame the energy review before asking for a magnetic bearing chiller selection. It uses a project-specific 35 percent reference from supplied Koven Air case material, not a guaranteed result.

Baseline kWh should come from bills. The percent field is a screen. Case data is not a promise. Server load changes daily. Redundancy affects pump energy. Condenser water changes the result. Controls can move part-load performance. Maintenance habits show up in power use. A poor setpoint can hide savings. Use the result to frame questions. Ask for rated data before purchase. PUE targets need the full plant view.

Estimation Parameters

Verify My Data Center Load

Projected Energy Savings