WSHP vs. Boiler + Chiller TCO Estimator

Estimate the crossover point where a Koven Air WSHP array’s lower operating cost offsets its higher day-one equipment cost, using the measured savings range from the two verified projects on this page.

Assumes a Koven Air array day-one equipment premium of 20-30% over the boiler+chiller baseline (independent industry data, see Section 4) and applies your selected annual opex savings tier from the two verified case studies. Actual results depend on utility rates, holding period, and site-specific design – request a project-specific estimate.