Six questions. The answer usually turns on one of them — whether two rooms need opposite modes at the same hour. The tool also shows the heating trade-off that gets discovered too late.

Do two zones need opposite modes at the same hour, on a normal day?

A hospital wing, an office core against a glazed perimeter, a laboratory.

YesNo

Do you need independent humidity control by reheat?

Subcool to dry the air, then reheat — clean rooms, constant-humidity spaces.

YesNo

Is winter heating output per terminal critical?

Cold climate, glazed perimeter, the terminal is the only heat source in the room.

YesNo

Is first cost a primary constraint?

4-pipe roughly doubles pipework and adds a coil, a second valve and sequencing control.

YesNo

Are shoulder seasons long, with mixed loads?

2-pipe locks the whole building to the plant’s current mode until changeover.

YesNo

Can the plant deliver hot and chilled water simultaneously?

4-pipe needs a plant that serves both loops at once. If it cannot, the question is closed.

YesNo / unknown
Answer the questions and a recommendation appears here, with the reasoning behind each driver.